Welcome to STORM ADVANCE INVESTMENTS PTY LTD
Projects

Projects

Newport

Porta Davis Homes reached out to us with a request for a tile deck constructed at the same level as the internal floor, aiming to reduce any potential tripping hazards. We are capable of aligning the finished floor level with the interior, as the water easily flows through the tile edges without requiring grouting, or it runs between the board edges on the composite material.

Porta Davis Homes reached out to us requesting a tile deck to be built flush with the internal floor to reduce potential tripping hazards. We can achieve this alignment because the water efficiently drains through the tile edges, eliminating the need for grouting, or it flows between the board edges on the composite material. Additionally, for new homes, we maintain a 25mm gap between the deck and the house to allow for termite inspections every 12 months. This practice is optional if the property has an effective termite treatment system in place.

SPEAK TO A SPECIALIST

tell us about your project

First Name
Last Name
Email
Phone
Email
Phone
Email
Phone
Message